SEQ
CHAPTER \h \r 1DESCRIPTION:
This work shall consist of the furnishing and placing
precast concrete paving and bedding materials. All
work shall be in accordance with these specifications
and in reasonably close conformity with the lines and
grades shown on the plans or established by the
Engineer.
MATERIALS:
Material shall meet the requirements specified in the
following subsections of Section 700 - Materials:
Bituminous Tack Coat (As
specified) 702-3601
anionic asphalt emulsion SS-1h
Asphalt Cement for Paving
702-02 or 702-03
Fine Aggregates
703-01
Mineral Filler
703-08
Precast Concrete Street Pavers
704-23
Water
712-01
Precast concrete street
pavers shall meet the requirements of §704-23 and shall
be the size(s), shape(s) and color(s) as specified in
the contract documents. Minimum thickness of
precast concrete street pavers shall be 80 mm.
Neoprene-Modified Asphalt
Adhesive shall
consist of 2% neoprene, grade WM1, oxidized asphalt with
a R & B softening point of 68ºC minimum and a
penetration of 80, and 10% asbestos-free fibers.
Polymeric Sand
shall be used to fill the
joints between the pavers. Color shall be as
specified in the contract documents.
CONSTRUCTION DETAILS:
The provisions under §401-3, Construction Details for
Plant Mix Pavements - General, shall apply.
Precast concrete street
pavers shall be laid in a bituminous setting bed over
the specified concrete subbase. Prior to placing the
tack coat, the concrete base shall free of moisture,
dirt and debris. The tack coat shall be applied at a
rate of approximately 1 l/m2. Thickness of
the compacted bituminous setting bed shall be 20mm.
Do not use the bituminous setting bed to correct
deficiencies in the concrete subbase. The setting
bed shall consist of asphalt cement meeting the
requirements outlined in either §702-02 or §702-03 mixed
with fine aggregate meeting the requirements of §703-01.
The asphalt cement shall be 7.0% of the total batch
weight. The mix shall be heated to approximately
163ºC. The tack coat and setting bed shall be installed
when the concrete temperature is 5º C and rising. A
coating of neoprene-modified asphalt adhesive shall be
applied by mopping, squeegeeing or troweling over the
top surface of the setting bed per manufacturer’s
instructions to provide bond under the precast concrete
street pavers.
All precast concrete street
pavers shall be laid in the herringbone pattern shown in
the contract documents or as directed by the Engineer to
provide a uniformly even surface. Joints shall be
2 to 4mm wide unless otherwise specified. No precast
concrete street pavers shall be laid when the air
temperature is expected to fall below 5°C.. Joint lines
shall not deviate more than ±15 mm over 15m from string
lines. Fill gaps at the edges of the paved area with cut
pavers or edge units. Adjust pattern at pavement edges
such that cutting of edge pavers is minimized. Cut
pavers with a masonry saw prior to placing along edge
restraints All cut pavers subject to tire traffic shall
be no less than one-third (1/3) of a whole unit. After
pavers are placed on the adhesive, set them in it with
at least one pass of a minimum 135 kg water-filled hand
roller. Replace any cracked units with whole units and
set them with the hand roller.
Polymeric sand shall be
swept over the precast concrete street pavers until the
joints are completely filled. The paver surface shall be
swept clean and the joints lightly wetted with water.
This joint filling operation shall not be performed if
the air temperature is expected to fall below 5°C.
METHOD OF MEASUREMENT:
Precast concrete paving will be measured by the number
of square meters placed as shown in the contract
documents, or as ordered by the Engineer
BASIS OF PAYMENT:
The unit price bid per square meter shall include the
cost of all labor, materials and equipment necessary to
complete the work, including setting bed material,
except that any necessary excavation and subbase course
will be paid for under their appropriate items.
Payment
will be made under:
Item No.
Item
Pay Unit
601.XX__18M
Precast Concrete Paving (Bituminous Setting Bed)
Square Mete